Current Projects


City Square- Building H

Worcester, MA

HVAC

General Contractor:
Consigli Construction

Currently in process

St. Gobain- Campus Renewal

Northboro, MA

Plumbing

General Contractor:
Cutler Associates

Currently in process

Metso Automation

Shrewsbury, MA

Plumbing & HVAC

General Contractor:
RH White Construction Co., Inc.

Currently in process

Anna Maria College- Field House

Paxton, MA

HVAC

General Contractor:
Cutler Associates

Currently in process

Flexcon

Spencer, MA

HVAC

General Contractor:
Cutler Associates

Currently in process


Completed Projects



Massachusetts College of Pharmacy & Science

Worcester, MA

Design Build

HVAC

General Contractor:
Cutler Associates

Completed in 2009

MCPHS-Worcester’s intimate and convenient campus is located at 19 and 25 Foster Street in downtown Worcester, Massachusetts. A new facility recently opened at 40 Foster Street.

Roche Brothers Supermarket

Mount Ida College -Veterinary Technology Facility

Newton, MA

HVAC

General Contractor:
Cutler Associates

Completed in 2009

The facility will house expanded space for animals, as well as surgery, recovery and laboratory facilities equipped with the most modern technology.

Roche Brothers Supermarket

Nichols College -Senior Suites II

Dudley, MA

Plumbing

General Contractor:
Lauring Construction

Completed in 2009

The $3.5 million residence hall for senior students features apartment-style accommodations in two layouts: 2 bedroom/1 bath or 4 bedroom/2 baths. Each suite will have a full kitchen and living area.

Roche Brothers Supermarket

The Watch Factory

Waltham, MA

HVAC

General Contractor:
Columbia Construction

Completed in 2009

The historic Watch Factory complex, located along the Charles River in Waltham, Massachusetts, consists of approximately 400,000 square feet of space in 22 interconnected buildings.

Roche Brothers Supermarket

Eagle Hill School -Cultural Center

Hardwick, MA

HVAC

General Contractor:
Consigli Construction

Completed in 2008

The Cultural Center is a new 45,000 square foot performing arts center and dining hall. The facility includes a 500 seat theatre, dining for 500, and kitchen.

Eagle Hill

Christopher Heights Assisted Living

Malboro, MA

Design Build

Plumbing & HVAC

Architect:
SMOOK Architecture & Urban Design, Inc.

General Contractor:
Cutler Associates

Completed in 2008

Christopher Heights new assisted living facility in Marlborough is J.J. Bafaro´s fifth project with Cutler Associates for Christopher House Assisted Living, Inc. The 53,000-square-foot, U-shaped, three story complex will contain 83 studio and one-bedroom apartments. Fifty of the units will be for low- to moderate-income seniors.

Christopher Hieghts

The Hanover Theater for Performing Arts

Worcester, MA

Plumbing

General Contractor:
Barr and Barr

Completed in 2008

The Hanover Theatre represents a $26 million restoration of the former Loew´s Poli Palace Theatre into a 2,300-seat for the performing arts.

Hanover Theater

Roche Brothers Supermarket

Westboro, MA

Plumbing

General Contractor:
JK Scanlan

Completed in 2008

The supermarket is part of the Bay State Commons Development.

Roche Brothers Supermarket

Clark University - Residence Hall

Worcester, MA

HVAC

General Contractor:
Consigli Construction

Completed in 2007

Clark´s newest residence hall is a new 208 bed hall on the corner of Beaver and Florence Streets.

Clark Residence Hall

Cambridge School of Weston - Science and Art Gallery

Weston, MA

Plumbing & HVAC

General Contractor:
Consigli Construction

Completed in 2007

Cambridge School of Weston´s new 22,000 sq. ft. Science and Art Gallery Building included classrooms, galleries to showcase art, community gathering spaces for events, and science labs and will serve as the hub for computer network systems. Green building elements of the project include a pellet hopper and boiler, composting toilets, leach fields, green roof, a groundwater recharge system, radiant floor heating, timber framing structure, FSC wood, recycled glass tile, bamboo flooring, heat recovery wheel, triple glazed windows, reusing blasted ledge for steps, stairs, retaining walls, and light sensors.

Cambridge School of Weston

BJ´s Wholesale Club

Uxbridge, MA

Plumbing & HVAC

General Contractor:
Cutler Associates

Completed in 2006

This $42 million, state-of-the-art, cross-docking facility is constructed of masonry and metal panels and serves to replenish more than 85 BJ´s Clubs throughout the northeast. With 239 loading dock doors and 560 parking spaces, the complex is capable of up to 520 pass-through distribution moves per day. Constructed in just 10-months, the building also includes storage space as well as a cafeteria and offices.

BJ´s Distribution

Straumann USA - Corporate Headquarters

Andover, MA

HVAC

General Contractor:
Cutler Associates

Completed in 2006

This 140,000 square foot building renovation represented Swiss-based Straumann Company´s first U.S. office. The technologically advanced facility provides manufacturing space for the design and production of dental implants, prototype labs, a dental and operating suite and a lecture-hall-style auditorium.

Straumann USA

The Overlook at Charlton

Charlton, MA

HVAC

General Contractor:
C.E. Floyd Company, Inc.

Completed in 2005

The 329,000 square foot addition of 205 independent living units was designed to complement the architecture of the existing building and historic Overlook hotel. Amenities include: spacious lobbies and lounge areas; private and group dining areas; commercial kitchen; great room for meetings, lectures, movies and special events; guest suites; library; convenience store; arts and crafts studio; game area; and solarium.

Overlook at Charlton

Clark University - Lasry Center for Bioscience

Worcester, MA

HVAC

General Contractor:
Consigli Construction

Completed in 2004

Clark´s new science building is a 50,000 square foot building housing bioscience classrooms and laboratories.

Clark University - Bioscience

NyproMolds, Inc. - Cleanrooms

Clinton, MA

Design Build

Plumbing & HVAC

General Contractor:
Cutler Associates

Completed in 2003

A 25,400 square foot, class-100,000 (ISO Clean 8) clean room with Hepa Filters.

Nypro Cleanroom

American Superconductor

Devens, MA

Plumbing & HVAC

General Contractor:
Cutler Associates

Completed in 2002

This 345,000 square foot building is a state-of-the-art, high-capacity, wire-pulling facility.

American Superconductor